Projects & Services - Reports
SIGA provides site inspections including a visual inspection and discussions
with involved parties on site to examine existing structure(s) and document
areas of concern.
The intension is to identify structural or safety concerns and potential
remedial action required. The results of the visual inspection and site
discussions are subsequently summarised in a structural report.
The reason for a problem is usually readily identifiable and is discussed on
site, as well as the recommended remedial action. The subsequent report further
provides the added reassurance of a record of the discussions.
Structural reports are provided for a variety of clients (and of course
owners of Industrial, Commercial or Industrial premises) including:
- Strata Managers
- Local Councils
- Insurance Companies
- Domestic and Commercial Real Estate Agents
- Maintenance Contractors
The following are examples of projects where structural reports where required
by our clients.
Wetherill Park – The leaning fence
Special Considerations / Challenges
- With regards to the fence, safety was of primary importance.
- Although it was unlikely to fall, the fence needed to be
propped whilst a suitable solution was determined.
- As is so often the problem with retaining walls, the key
challenge was the drainage.
- Therefore, it needed to be demolished and rebuilt or a
suitable alternative which needed to be both feasible and
approved by Council.
The SIGA Solution
- Initial structural assessment and provision of report and
details for propping.
- Suggested options for design solution.
- Preparing design solution for consideration by Council.
More information in July 2009 newsletter -
click here
|
 |
|
|
Glenorie – Footing Repair
Special Considerations / Challenges
- To provide the builder with a finished product that would be at
least equal to, if not better than, the original intended works.
- Ensuring that all repairs to footings complied with relevant
standards.
- Identifying the most suitable option to adopt for the repair.
- The footings to this project were initially poured with
insufficient cover to the reinforcement.
The Siga Solution
- Topping the existing footings was deemed the most suitable
solution.
- Site inspections, professional discussions, preparation of
relevant structural reports.
- Documentation of remedial repair details.
- Inspections during topping pour.
- Inspection of completed works and review of concrete core
results.
More information in January - February 2009 newsletter -
click here
|
.jpg) |
|
|
Parramatta - Repairs to Concrete Degradation
Special Considerations /Challenges
Concrete cancer had affected the underside of the walkway to
the weir and Siga was contracted to provide instructions on the
rectification works. Pedestrian access of the walkway during the
repairs needed to be considered as was flooding to the weir when it
rains!
The SIGA Solution
Determining suitable solutions and material with the builder
to cater for the submerged environment that the repairs would be
exposed to.
|
 |
|
|
Redfern - Structural Integrity
Special Considerations /Challenges
This building was a major investment for the intending purchaser who
wanted reassurance that the building didn’t have any hidden
significant structural concerns.
The SIGA Solution
Provided a visual examination of the building. Subsequent report
prepared commenting on the areas of concern including existing cracks
in brickwork along with any potential items of concern such as the
ageing existing roof and floors.
|
 |
|
|
Bellevue Hill - Structural Opinion
Special Considerations / Challenges
Retaining wall failure
The SIGA Solution
Provided professional discussions and advice on site and a subsequent report
detailing our view that the failure occurred as a result of
excavations next to the wall, combined with poor initial design for
the load conditions.
|
 |
|
|

|