SIGA has had the privilege of being involved in providing
engineering solutions for many interesting medium density projects. For your
benefit, a selection of medium density case studies are available for review.
Schofield
- Medium Density Developments
Special Considerations / Challenges
- As this project involved three different sites, with
anywhere from 5 to 8 townhouses being built, the key objective
focused not only on minimising costs but creating a standard way
of doing the project that also complied with the Australian
standards.
- It was also critical to ensure that the flow of work on site
proceeded without any obstacles.
- Getting a consistent and predictable result, no matter where
the site is located.
- Achieving a cost-effective methodology that is simple and
easily duplicated for future projects.
The Siga Solution
- Bridging the gap between the desired outcome of obtaining
the most cost-effective way to construct the townhouses and
working with the individual site locations.
- Navigating through the red tape, staying on top of and ahead
of any potential obstacles as well as providing the structural
design for the piers, foundation slabs and steel beams and
detention tanks were required.
- Providing site inspections for the designed components, any
additional items during construction and any further site
specific requirements.
- Discussions to determine suitable strategies towards the
design and relevant construction processes.
More information in November 2007 newsletter -
click here
|
|
|
Bankstown
– Townhouse Development
Special Considerations / Challenges
- The original builder of a large residence on this property
was brought back
many years later to construct these townhouses
- It is conveniently positioned close to the M5 and the
Christies Homemaker Centre in Bankstown
- It involved the removal of
the large residence
The SIGA Solution
- Design of strip footings and floor slabs to all units
- Design of structural steel beams to support roof & brickwork
loads
- Structural details to on site detention basin
|
Fairfield
Heights – Medium Density Development
Special Considerations / Challenges
- Waffle raft slab construction including foundation piers to all
the units
- Very well presented townhouse/villa development
- Negotiations with council for approval
- Unusual site conditions
The SIGA Solution
- Providing the initial design, including waffle raft, piering and
structural steel beam design
- Conducting all site inspections and certifications
More information in August 2005 newsletter ( 225KB.) -
click here
|
Ryde
- Walk up Units
Special Considerations /Challenges
- Concrete beam & column design to lowest level
- Simplification of inside to outside slab transition with the
floor slab structural design & detailing
- Satisfying special drainage requirements for corner block
including mechanical pump out and on site detention
The SIGA Solution
- Full structural design and documentation of all concrete
foundations, ground floor upper level floor slabs and site
retaining walls
- Site inspections and certification of steel reinforcement to
all design components (transition slab through out and
professional advice on site during construction)
|
|
|